Through intelligent upgrade, the site achieves efficient power generation and supports two-wing services, reducing carbon emissions by 10 tons per year
China Tower Zhejiang and Huawei jointly deployed the peak staggering and intelligent power consumption management solution, reducing electricity fees by CNY4000 per site each year
China Tower Zhejiang Branch and Huawei worked together and used iSitePower AI technologies to implement intelligent peak staggering at base stations.
After the reconstruction, the electricity fee was reduced by USD$1,800, and the carbon emission was cut by 6 tons per year, realizing 5G deployment without adding energy OPEX.
iSuperSite upgrades the China Mobile Hangzhou metro equipment room by replacing 9 cabinets with 3, improving energy efficiency to 86% and cutting annual electricity costs by 29%+.
The simplified "one-blade" solution used at the site boasts an energy efficiency of 97% and is maintenance-free and wall-mounted.
Prefabricated and modular DC reduces construction waste, shortens TTM by over 50%, and maximizes DC value through innovative technologies
NRC's new data center implements full-lifecycle management, with power supply, cooling, and O&M all managed remotely and intelligently
MNG Kargo constructs a next generation data center, in turn strengthening the infrastructure of its transit centers nationwide, simplifying logistics management, and improving management efficiency
Intelligent diagnosis, quick response