This accomplishment signifies that GBB Data Center's design and facilities meet the highest international standards, ensuring high reliability and availability.
PT Bukit Asam's groundbreaking off-grid solar project with Huawei FusionSolar is here to redefine sustainability
REDtone adopts Huawei iSolar solution to build 100% PV-powered rural sites.The new solution enables sites to reduce the use of gensets and manual O&M, improves the reliability of site power supply.
Huawei has played a pivotal role in this sustainable endeavor by constructing the largest photovoltaic-energy storage microgrid station globally, featuring a massive 400MW solar PV system complemented by a 1.3GWh energy storage system
Slater Young’s Ask Me About Solar Video Series
A China Mobile site in Beijing was reconstructed by using the third-generation 12 kW smart blade power system and deploying a PV system.
China Mobile (Shaanxi) delivers nearly 1000 data center racks within six months and implements natural cooling for 10 months each year with Huawei FusionDC solution
Huawei's iSuperSite showcase, a joint venture with China Mobile Hangzhou and the China Mobile Design Institute in Hangzhou, is located in Herui International Science and Technology Plaza in Hangzhou High-tech Development Zone (Binjiang).
Wuhan AI Computing Center was completed within 120 days, halving the rollout time. The PUE is as low as 1.25, and the annual power saving exceeds 3.4 million kWh