This accomplishment signifies that GBB Data Center's design and facilities meet the highest international standards, ensuring high reliability and availability.
Huawei has played a pivotal role in this sustainable endeavor by constructing the largest photovoltaic-energy storage microgrid station globally, featuring a massive 400MW solar PV system complemented by a 1.3GWh energy storage system
China Mobile (Shaanxi) delivers nearly 1000 data center racks within six months and implements natural cooling for 10 months each year with Huawei FusionDC solution
Huawei's iSuperSite showcase, a joint venture with China Mobile Hangzhou and the China Mobile Design Institute in Hangzhou, is located in Herui International Science and Technology Plaza in Hangzhou High-tech Development Zone (Binjiang).
Wuhan AI Computing Center was completed within 120 days, halving the rollout time. The PUE is as low as 1.25, and the annual power saving exceeds 3.4 million kWh
The outdoor blade power + PV site jointly built by China Tower Zhejiang and Huawei is deployed in Hangzhou.
A China Mobile site in Beijing was reconstructed by using the third-generation 12 kW smart blade power system and deploying a PV system.
The modules can be quickly stacked onsite, cutting the construction period in half and reducing construction waste by 80%
Turkcell and Huawei realize the importance of long-term commitments to climate action to win the future for the world.